These 2 ADVANCED designed & built 65 dB(A) at 1 metre Bespoke Acoustic Enclosures containing Cummins 2500 kVA Diesel Generators will be installed on the same site where we also installed 4 x 1400 kVA Cummins Open Generators in a plant room. The whole installation will provide backup power to a newly built "Super Hospital" in the UK.
These 2 x 41ft Switchgear Modular Housings are the first of four units to go to site that will create one big switchgear room. After the fit-out of LV switchgear and data modules, the unit will be shipped to Germany for installation.
These 2 x 20ft Acoustic Enclosures were manufactured by ADVANCED for a prestigious generator client - The free issue generators were fitted by ADVANCED and transported to site for installation at 2 water works sites in Scotland.
This Cummins 33 kVA Silent Diesel Generator is on its way to a small town in Wales where the power supply is intermittent with current weather conditions. This generator will provide backup power when required to a small truck engine overhaul garage.
This is the first of many Bespoke Switchgear Housings designed & manufactured at our new Rotherham Modular Solutions factory. Watch this space as we aim for full production of 4 enclosures per month by the end of 2019. We were in production within 9 weeks of taking over and redeveloping the site.
This 30ft Bespoke Switchgear Housing is now on its way to the client to be fitted out with the LV / HV Switchgear that will integrate recycling waste to energy back into the National Grid.
It's dark and dim at both ends of the day but the show goes on at ADVANCED 24/7. This Bespoke Enclosure is heading for a water treatment plant in Scotland.